We've heard the public's concerns and would like to respond transparently with complete facts regarding the George Marine Resort & Residences development.

The George is too big!

Concern: The George exceeds the height and massing guidelines in the new Official Community Plan.

Response: The building height has been lowered 11.5 feet, to a 5 story building, from the initial plan and complies with the zoning currently in place. The key question is whether the additional height is justified by the benefits it enables.

To operate successfully year-round, The George needs facilities such as a conference centre, chapel, wellness centre and event spaces. These uses require additional floor area that helps attract visitors beyond the summer season. The Sunshine Coast currently lacks facilities large enough for major conferences, indoor weddings and events, and organizations that have often been turned away as a result.

The additional height helps make possible:

  • A viable year-round hotel
  • 130 full time jobs (approx)
  • $10 M in annual payroll
  • Ongoing tax revenue
  • Conference and event facilities not currently available at this scale on the Sunshine Coast
  • New public waterfront amenities and infrastructure

The George will impact the Aquifer!

Concern: Excavation could penetrate the aquitard in one area, creating concern about possible impacts on the aquifer.

Response: The George development is working with The BAUER Group, a global leader in specialized foundation engineering, diaphragm walls, and complex deep shoring systems. They have been brought into the planning and technical scoping to implement specialized, low-impact groundwork and soil-stabilization methods that safeguard the aquifer while anchoring the concrete parkade and multi-story hotel.

Excavation will proceed in controlled 15-metre sections using cutter soil technology to create protective concrete walls before soil is removed and replaced with engineered fill. Independent professional reviews have concluded the project can be built safely. Construction will be centrally coordinated to ensure careful monitoring and rapid response if required.

The 'Underground' Parking will Flood

Concern: Underground parking on a low-bank waterfront site could increase flood and groundwater risk.

Response: The parkade is above the natural ground level. It is designed at existing grade and above the king-tide level, reducing exposure to tidal flooding.

The George will Impact Winegarden Park

Concern: Construction could encroach on Winegarden Park, affect mature trees and restrict public access.

Response: The development itself remains entirely within its property lines. A stream along the shared boundary must be relocated fully within the park, requiring removal of some trees. The affected area will be restored and landscaped at the developer's expense. Winegarden Park will not be used for construction staging.

It impacts Gibsons Village Character

Concern: The project's scale could change the small-town waterfront character of Lower Gibsons and affect existing views.

Response: The design has been revised to create a public view corridor through the plaza and improve access to the waterfront and seawalk. The objective is to strengthen the waterfront as a public destination while adding hotel, conference and community amenities that support year-round activity.

Loss of Public Parking

Concern: Additional public parking may not fully account for existing street spaces lost through redevelopment and the Winn Road closure.

Response: An independent parking review identified the loss of 12 existing street spaces. These are replaced, with an additional 41 parking spaces available for public use.

The Environmental impact on Remediation

Concern: Past industrial activity has left contaminated soil and sediment, raising concern about disturbance during construction.

Response: Updated environmental work has been completed and remediation must comply with provincial and federal requirements. Contaminated material from previous uses will be removed and disposed of appropriately. The current project no longer includes marine construction.

The real Development Cost Charges

Concern: Development Cost Charges (DCC) are mandatory and should not be presented as voluntary community contributions.

Response: Correct. DCCs are required development charges. They are nevertheless an important source of funding for the infrastructure needed to accommodate growth and are directed to designated transportation, water, sewer and drainage improvements.

Local disruption from construction

Concern: Several years of construction could affect nearby residents, businesses, traffic and pedestrian access in Lower Gibsons.

Response: Construction activity will be contained within the development site wherever possible. A construction-management plan and designated haul routes will be used to reduce impacts on Lower Gibsons businesses, residents and waterfront traffic.

Impact on local Traffic

Concern: Additional hotel guests, residents, employees and service vehicles could add congestion to roads that already have limited capacity.

Response: An independent traffic study assessed the additional vehicle movements and concluded they can be accommodated by the existing road network and proposed improvements.

Municipal Services & Emergency Response

Concern: A larger development will place additional demands on municipal services, police and fire protection.

Response: The developer will invest approximately $2.25 million in storm, sewer, road, water and electrical upgrades that also support Lower Gibsons and future growth. The project is also expected to generate approximately $1.5 million annually in property tax revenues, helping fund ongoing municipal and regional services.

No quality jobs created by the George

Concern: Hotel development can create seasonal or lower-wage service employment rather than stable year-round jobs.

Response: The George is designed as a year-round hotel and conference destination, not a seasonal resort. It is projected to create more than 100 direct local jobs, along with additional economic activity for local restaurants, shops, suppliers and service businesses.

The Hotel's Consumption of our local water

Concern: A 114-room hotel, restaurants and wellness facilities will increase demand on Gibsons' drinking-water supply.

Response: A 2022 Waterline study commissioned by the Town concluded that the aquifer could conservatively support the water needs of a community of approximately 10,000 people, more than twice Gibsons' current population. The project's water demand should be considered within that broader capacity assessment.